Page 47 - Demo
P. 47


                                    FINAL ACCEPTANCE COMPLETED FOR THE %u00c7%u0130%u011eL%u0130 TRAMWAY BRIDGE WITHIN THE %u0130ZM%u0130R %u00c7%u0130%u011eL%u0130 TRAMWAY LINE PROJECTOn May 26, 2024, the partial final acceptance of the 750-meter-long %u201c%u00c7i%u011fli Tram Bridge Construction%u201d section an integral part of the %u0130zmir %u00c7i%u011fli Tram Line Project, which received provisional acceptance on January 22, 2024 was completed.PLOIE%u0218TI%u2013BUZ%u0102U LOT-3 HIGHWAY PROJECT OFFICIALLY COMMENCESTURKISH AEROSPACE (TUSA%u015e) B1070 TEST BUILDING PROJECT DELIVEREDCONTRIBUTION TO THE PRODUCTION OF ATAT%u00dcRK BUST FROM TUSA%u015e CONSTRUCTION SITESMaterials and labor were provided by TUSA%u015e construction sites to support the production of an Atat%u00fcrk Bust at the newly opened Ak%u0131nc%u0131 Gendarmerie Station, located near TUSA%u015e. Within the scope of this support, the materials and labor provided by the construction sites were used in the production process of the Atat%u00fcrk Bust, contributing to the needs of the Ak%u0131nc%u0131 Gendarmerie Station.The TUSA%u015e B1070 Test Building Project has been successfully completed and handed over with meticulous attention to detail. The steel-structured building, which stands approximately 60 meters tall and covers an enclosed area of 14,000 m%u00b2, included the execution of all infrastructure, reinforced concrete, architectural elements, steel construction, electrical and mechanical installations, as well as testing and commissioning processes. A total of 5,850 tons of steel were utilized in the project. This project is anticipated to serve the country well, and heartfelt gratitude is extended to all team members and stakeholders who contributed to its realization.Work on the Ploie%u0219ti%u2013Buz%u0103u Highway Lot-3 (km 49+350 to km 63+250) officially began on March 1, 2024. This major infrastructure project, tendered by the Romanian National Company for Road Infrastructure Administration (CNAIR) on September 16, 2021, and awarded on December 28, 2023, is being executed under a unit price contract with a budget of LEI 1,093,477,339. The project is scheduled for completion on October 31, 2025. The project involves the construction of a 13.9 km-long, 2x2-lane highway, one maintenance and operations facility, one service area, two interchanges, seven bridges totaling 1,907 meters in length, and a 3.3 km access road. Key works include earthworks, structures, infrastructure relocations, bored pile works, bridge and overpass construction, landscaping, superstructure works, road markings, and guardrail installations.%u0130N%u015eAAT47
                                
   41   42   43   44   45   46   47   48   49   50   51