Page 43 - Demo
P. 43


                                    SECOND PHASE OF THE ASIA REGION WATER TREATMENT PLANT PROJECTThe groundbreaking ceremony for the second phase of the %u0130SK%u0130 Cumhuriyet Drinking Water Treatment Plant was held on April 25, 2024. This expansion will increase the treatment capacity of raw water delivered from the Melen system to the Cumhuriyet Treatment Plant by 50%. It was noted that Istanbul's daily drinking water capacity will reach 2.88 million cubic meters, providing water to both the Anatolian and European sides of the city.Districts experiencing water stress, such as Ba%u015fak%u015fehir, Bayrampa%u015fa, Be%u015fikta%u015f, Beyo%u011flu, Ey%u00fcpsultan, Fatih, Esenler, Gaziosmanpa%u015fa, and %u015ei%u015fli, will benefit from a 50% increase in water supply through direct transfers via the northern Bosphorus pipeline. %u0130N%u015eAAT43
                                
   37   38   39   40   41   42   43   44   45   46   47