“ Our Southern
                                                                                                            Approach
                                                                                                            Viaduct project
                                                                                                            gave important
                                                                                                            experiences to
                                                                                                            the construction
                                                                                                            sector that
                                                                                                            entered
                                                                                                            the bridge
                                                                                                            construction
                                                                                                            literature. It
                                                                                                            became one of
                                                                                                            the reference
                                                                                                            projects of bridge
                                                                                                            construction
                                                                                                            with its design
                                                                                                            and construction
                                                                                                            techniques,
                                                                                                            especially push-
                                                                                                            drive and heavy
                                                                                                            lifting methods,
                                                                                                            foundation
                                                                                                            structure and
                                                                                                            corrosion
                                                                                                            protection
                                                                                                            features. “








              separately at each span.  In the Southern  a  section of  1.123  meters  and with  heavy  Southern  Approach  Viaduct  project  gave
              Approach Viaduct, on the other hand, we  lifting method in a section of 256 meters.  important experiences to the construction
              made use of  the flexibility  of steel in its                                sector that entered the bridge construction
              design and construction because of the size  The push-drive method used in the project  literature.  It became one of the reference
              of the earthquake loads. For this reason, its  was implemented by pushing upwards a  projects of bridge construction with its
              entire superstructure above the foundation,  single piece of deck slab structure with an  design  and  construction  techniques,
              which consists of the abutment and the deck  overall length of 1.123 meters, width of 36  especially  push-drive  and  heavy  lifting
              slab, is steel. Its deck slab is continuous,  meters and weight of 22.500 tons in a radius  methods,  foundation  structure  and
              single piece and welded along 1.379 meters.  of 2.000 meters and at a slope of 3,5%, and  corrosion protection features.
                                                     it is the first one in the world with these
              Its foundation structure in reinforced  characteristics.                     Looking at the project as a whole, which
              concrete; due to the soil structure consisting                               companies are performing the works in
              of sand and clay and due to the magnitude  In addition to the construction works carried  progress  and  in  which  regions?  Are  the
              of the earthquake loads, it was constructed  out by Nurol Construction, we know that  dates for opening the sections to traffic
              with Diaphragm Wall Type Foundation  steel construction and steel deck slab drive  definite in the future periods?
              structure with continuous reinforcement  works are performed by Nurol Steel, one of
              in horizontal, which is implemented in our  our group companies. A Turkey record was  The section between Gebze-Gemlik has
              country for the first time in this project.  broken as of July 2015 by placing the last  been opened to traffic as of 30 June. The
                                                     deck slab. Would you please mention about  Gemlik-Bursa section is being constructed
              It is coated with a special surface protector  this?                         by Makyol, Bursa-Susurluk section by
              due to the reasons that its upper structure                                  Göçay, Susurluk-Balıkesir section by Astaldi,
              is steel and  it is located in a corrosive  As I mentioned just above, construction of  Balıkesir-Kırkağaç-Akhisar section by Nurol,
              atmosphere, that is in marine environment.  the viaduct deck slab was made by applying  Akhisar-Manisa section  by Özaltın-Makyol
              It has a surface protection with cold zinc  the heavy lifting method in a section of 256  Partnership and Manisa-İzmir section by
              coating material and special paint coating  meters consisting of 2 small and 2 big parts.  Özaltın.
              that does not require any maintenance for
              35 years. Its geometry was affected by the  The largest of these parts is 124 meters long,  Works are being carried out at all sections
              geography it is located in; the environmental  36 meters wide and weighs 2.600 tons. This  intensively; Gemlik-Bursa section and the
              and historical circumstances and its  part was constructed on the ground and was  20-km part between Bornova-Kemalpaşa
              construction became difficult. For this  lifted to its position at a height of 57 meters.  are planned to be opened to traffic at the
              reason, the construction of the viaduct deck  With these characteristics, a country record  end of 2016 and the other sections are
              slab was made with push-drive method in  was broken as construction technique. Our  planned to be opened in 2019.