NATIONAL











































          Gebze  -  Orhangazi  -  İzmir





                    Highway  Construction







        Ch: 40+000 - 41+000 General View

                                                                     Gebze – Orhangazi Section

                                                                     It is approached to the end of the construction works within the
                                                                     scope of contract that NUROL signed with NÖMAYG (Employer)
                                                                     for the construction works of section approximately 9 km length
                                                                     that takes place between Gebze - Orhangazi (Ch: 34+350-43+296)
                                                                     of “Gebze - Orhangazi - İzmir Motorway (Including Izmit bay
                                                                     suspension bridge and access roads )” (Figure 1), which is constructed
                                                                     with Build-Operate-Transfer model under the obligation of Otoyol
                                                                     A.Ş.  (Company  In  Charge).  Responsibility  area  of  NUROL  takes
                                                                     place between Samanlı Tunnel exit and Orhangazi (Figure 2). Earth
                                                                     works, structures, geotechnical works, landscape, toll collection
                                                                     and secondary works (utility relocations, service and park areas) are
                                                                     under the responsibility of NUROL pavement works are excluded. In
                                                                     addition to service area on Ch:37+500 K4 Junction and toll collection
                                                                     area were constructed on Ch: 40+000 of the Motorway.