Page 42 - World Of Nurol Magazine 30
P. 42
the İstanbul market was an encouraging factor for us. If it wasn’t
for our bosses who always had faith in us, trusted, protected and
supporting us no matter what happened, it would not be possible
for us to achieve this success. It is so comforting to know that we
can reach to our bosses whenever we have any problem. This is
success recognized today in Turkey and even in the World that we
are proud of belongs first to Nurol and then to us.
This project is carried out in cooperation with an international
finance institution. Can you tell us more about credit institution?
It is very important to obtain all required legal environmental and
regional licenses and carry out both mining and processing stages
according to a plan in this sector that have many risks. We have
been engaging in close cooperation with International Finance
Institution EBRD for more than three years in order to maintain
highest technical, environmental and social standards in our mines.
Expertise of EBRD in the sector is very important for our activities in
mining. This year, Lapseki and İvrindi Gold Mine projects of TÜMAD
Mining were rewarded with “Best Deal in Natural Resources” Branch.
For the first time, a Turkish company in mining sector was decorated
with EMEA Business Awards.
You are living in Ankara. Mines are far away. How do you manage
these mines?
During the last seven years, I tried to go both to Çanakkale and grinding processes, ore are enriched with vat leaching method in
Balıkesir every week without delay. Dialogue with especially local order to obtain gold and silver dore. Process waste formed during
people was very important. We had to show utmost attention to these processes are pressed and dewatered with filter press
public relations. Although, we have an expert on public relations in following chemical treatment and detoxification and then stored
our company, I personally involve in these relations. It was a must at the Solid Waste Storage Area. Project is compatible with the
for us to explain our activities to them and receive their support. performance requirements of the European Bank for Reconstruction
Finally, these are the investments that will make contribution to the and Development. Moreover, it is an example project that has “best
economic development of the region and decrease unemployment. applicable technology”.
Can you give us technical information about Lapseki and İvrindi After waste of the premises were treated in INCO SO2/Air Chemical
mines? Treatment Unit and dewatered in the filter press system and turned
into a solid matter and sent to Solid Waste Storage Areas where
Lapseki Project Field is 35 kilometers away from the city center their impermeability is maintained by using geomembrane and
of Çanakkale and 7 kilometers away from Lapseki district center. compressed clay layers in Lapseki Gold Mine. When its compatibility
Settlements near the project field are Şahinli, Kocabaşlar, Yenice, with environmental measurements and guarantees according to
Subaşı and Çamyurt neighborhoods. Closest locations to the national and international standards is considered, it can be seen
impact are Şahinli and Kocabaşlar villages. Construction stage of that it is one of the safest and best implementations in the world.
Lapseki Project was completed and processing began in December, İvrindi Project is located 60 kilometers away from the city center
2017. Within the framework of project, gold and silver minerals of Balıkesir, 4 kilometers away from Küçükılıca village, 4,8
are obtained from mines (Karakovan, Karatepe, K-Zone and SBCX kilometers away from Değirmenbaşı village and 8 kilometers away
mines) by using explosion mining method. Following crushing and from Karadere village. TÜMAD has completed basic and detailed
engineering works of “İvrindi Gold and Silver Mine Project” and
construction stage began in April of 2018. Economic life of mine
mentioned in this project is 15 years. It is planned to complete the
investment and commence production in June, 2019. Gold and silver
ore will be obtained from 4 mines (Ballıktepe, Karteldere, Kabaktepe
and Güney-Boyun mines) within the framework of the project.
Explosion open mine method will be used for mining. Ore will go
through heap leaching and enrichment process in order to obtain
gold and silver dore as final product. Feasibility of the project was
prepared according to NI-43-101 Canadian standards.
It is estimated that total of the project is 1.500.000 ounce of gold
and 2.500.000 ounce of silver. Tenors per ton of gold and per ton of
silver are respectively 0,67 g and 1,62 g. Within the framework of the
project, total ore production target is 45 million tons and total waste
production will be 101 million tons. Within the context of the project,
ore-waste ratio is 1/2 and opencast mining method with millisecond
delayed explosion will be used. Opencast mining method that will
be used in the field will include five basic process namely, drilling,
explosion, excavation-loading, transportation and disposal of ore.
Ore will be transported to the storage area and divided into small
pieces. Following the pelletizing process, ore will be placed on heap
leach area and will go through cyanide solution dripping method
diluted via pipeline network. This solution will resolve gold inside
the cracked ore. Gold loaded solution will turn into gold and silver
dore bars at the ADR units. Following the heap leaching process, the
Berna YÜCEL, Derin YÜCEL, Hasan YÜCEL, Ecesu YÜCEL area will be cleansed and natural soil will be placed on its in order to
plant trees.
42
30 SAYI DERGI NUROL ING 01.indd 42 27.03.2019 15:17:43