Page 21 - World Of Nurol Magazine 29
P. 21
NATIONAL
Gebze - Orhangazi - İzmir
Motorway Construction
Gebze - Orhangazi Section
Project Manager: Yavuz YÖNTEM
The construction works within the scope of
contract that NUROL signed with NÖMAYG
(Employer) for the construction works of
section approximately 9 km length that takes
place between Gebze - Orhangazi (Ch: 34+350-
43+296) of “Gebze - Orhangazi - İzmir Motorway
(Including İzmit bay suspension bridge and
access roads )” (Figure 1), which is constructed
with Build-Operate-Transfer model under the
obligation of Otoyol A.Ş. (Company In Charge)
has been completed by the end of March 2016.
This section of motorway was opened to the
traªc on April 2016. Responsibility area of
NUROL takes place between Samanlı Tunnel
exit and Orhangazi settlement. (Figure 2).
Earth works, structures, geotechnical works,
landscape, toll collection and secondary works
(utility relocations, service and park areas) are
under the responsibility of NUROL, pavement
works are excluded. In addition to service area
on Ch:37+500, K4 Junction and toll collection
Şekil 1 area were constructed on Ch: 40+000 of the
Motorway.
22