               Gebze - Orhangazi – İzmir





                                                 Motorway










                     The tender for the Gebze-Orhangazi-İzmir Motorway Project   Current Structure  Summary of Ongoing Design Studies
                     (including İzmit Bay Crossing and Connection Roads) was
                     made on 9 April 2009 and the 22 years 4 months construction    MAIN CONSTRUCTION ITEMS          TOTAL NOS
                     and operation offer was determined as the best and final.  SUSPENSION BRIDGE                         1
                                                                              TUNNEL                                      3
                     Implementation  Contract  was  signed  on  27  September
                     2010 between General Directorate of Highways and OTOYOL   VIADUCTS                                  38
                     YATIRIM  ve  İŞLETME  A.Ş..  Following  the  signing  of  the   Reinforcement                       36
                     contract  OTOYOL  A.Ş.  has  started  to  construction  with   Steel                                 1
                     the use of equity in line with Implementation Contract.   Composite                                  1
                     As of 5 June 2015, the entire financing requirement of the
                     Project has been completed. Construction works continue   BRIDGES                                   175
                     to accelerate.                                           Overpass                                   88
                                                                              Underpass                                  47
                     A total of approximately 6271 personnel are employed in the
                     Gebze-Orhangazi-İzmir Motorway Project in the direction of   Hydraulic                              39
                     January 2017 month data.                                 Composite                                   1
                                                                              BOX CULVERTS                               987
                     A total of 433 km motorway is being constructed as 384 km   Box Culuert (Underpass)                 284
                     motorway and 49 km connection roads.
                                                                              Box Culvert(Hydraulic)                     703
                     Project Characteristic Information:                      INTERSECTION                               24
                                                                              MOTORWAY SERVICE AREA                      18
                     •   Motorway Main Body: 384 km
                     •   Existing Bursa Ring Road (Open to Traffic): 21 km    MOTORWAY OPERATION - MAINTENANCE            4
                     •   Total Motorway Main Body: 405 km                     FACILITY
                     •   Connection Roads: 49 km                              TUNNEL OPERATION FACILITY                   2
                     •   Intersection Roads: 140 Km
                     •   Side Roads: 26 Km
                                                                                *3 nos intersections including Existing Bursa Ring Road.