El Jadida-Safi Motorway is a two-lane and 142,1 km length toll road which
                                                           takes place on Atlantic Ocean Coast and contracted out by Morocco Motorways
                                                           Company (Autoroutes de Maroc-ADM) for the purpose of contributing tourism,
                                                           industry and social development of the region.

                                                           Under two separate contracts which are signed by ADM and our company on
                                                           2012, 3  parcel “Sidi Smail  - Oualidia” and 4  parcel “Oualidia  - Safi” sections
                                                                  rd
                                                                                                   th
                                                           that totals 82.1 km were constructed.
                                                           In total; 7.1 million m  excavation, 8.6 million m  filling, 1.8 million m  base/
                                                                                                        3
                                                                                                                            3
                                                                               3
                                                           sub-grade, 860 thousand tons hot mix asphalt and 230 thousand m  concrete,
                                                                                                                         3
                                                           10 thousand tons ironwork including 2 viaducts, 30 vehicle overpasses, 2
                                                           pedestrian overpasses, 16 vehicle underpasses, 16 pedestrian underpasses, 57
                                                           km drainage pipeline, 111 km drainage channel were carried out in the scope
                                                           of work for the projects.
                                                           Provisional acceptance has been done as of 10  March 2016 and highway was
                                                                                                      th
                                                           opened to traffic on 4  August 2016.