Page 27 - World Of Nurol Magazine-26
P. 27
Under two separate contracts which are signed by ADM and and 57 km drainage piping and 90 km drainage channels are
our company on 2012, 3 parcel “Sidi Smail – Oualidia” and carried out.
rd
4 parcel “Oualidia – Safi” sections that totals 82.1 km will
th
be constructed. 98% of works on underpasses and overpasses are completed
and accessory and terminating works are underway.
Under the coverage of projects, there are 7.1 million m Currently, together with sub-grade and base course, hot
3
excavations, 8.6 million m made-up ground, 230 thousand mix asphalt spreading carried on and total 81 thousand km
3
m concrete, 860 thousand tons hot mix asphalt and binder, 58 km wearing application are completed.
3
various engineering structures.
Project is carried on at full steam; hand over is planned on
Up to date, total 7.1 million m excavation and 8.5 million m March 2016.
3
3
made-up ground, 8.300 tons ironwork, 182.000 m concrete
3