lısu  Dam  and  HEPP  will  have  the
                                                                                         fourth biggest capacity HEPP in Turkey
                                                                                         with its 1200 MW installed power
 ILISU DAM AND                                                                       IMW) - Karakaya (1.800 MW) and Keban
                                                                                         production after Atatürk (2.400

                                                                                       (1330 MW) Dams.
                                                                                       The Project is awarded to the International
                                                                                       Consortium under the leadership of Nurol
 HYDROELECTRIC                                                                         on turnkey basis through the contract
                                                                                       signed with the General Directrote of
                                                                                       State Hydraulic Works (DSI).

 POWER PLANT





























































          Following the signing of the contract, the
          construction of the dam of Concrete Faced Rockfill
          body type, was started in January in 2010 and it is
          planned to be ready for reserving water at
          the end of 2015.