lısu Dam and HEPP will have the
fourth biggest capacity HEPP in Turkey
with its 1200 MW installed power
ILISU DAM AND IMW) - Karakaya (1.800 MW) and Keban
production after Atatürk (2.400
(1330 MW) Dams.
The Project is awarded to the International
Consortium under the leadership of Nurol
HYDROELECTRIC on turnkey basis through the contract
signed with the General Directrote of
State Hydraulic Works (DSI).
POWER PLANT
Following the signing of the contract, the
construction of the dam of Concrete Faced Rockfill
body type, was started in January in 2010 and it is
planned to be ready for reserving water at
the end of 2015.