Page 36 - World Of Nurol Magazine 29
P. 36
Amounts realized on the basis of main
construction items for Phase 1 are as
follows:
STRUCTURE TYPE QUANTITY
Main Motorway Length : ~52,5km
Suspension Bridge: 1 NOS /2.907 m
Tunnel : 1NOS/3.522m
Viaduct: 8 NOS/4.922 m
Bridge: 12 NOS/528m
Overpass : 15 NOS/1.397m
Boxculvert: 98 NOS/6.171 m
Underpass: 49 NOS/3.015 m
Intersection : 5 NOS
Motorway Service Area: 3NOS
Motorway Operation - Maintenance Facility: 1 NOS
Tunnel Operation Facility: 1 NOS
As of 30 June 2016, the construction of Phase 1 was completed and opened to traªc.
Phase 2 A (Main body length approx. 25 km, between Gemlik - Çağlayan (Existing Bursa Ring Road) intersections)
Selçukgazi Tunnel is located in Phase 2 A. The construction and acceptance of Phase 2 A has been completed. It has been
opened to operation since 12 March 2017.
Amounts realized on the basis of main construction items for Phase 2 A are as follows:
STRUCTURE TYPE QUANTITY
Main Motorway Length : ~25,14 km
Tunnel : 1.247,66 m
Viaduct: 6 NOS/2.672,20 m
Bridge: 2 NOS/170,32 m
Overpass : 12 NOS/623,20 m
Boxculvert: 47 NOS/4.759,26 m
Underpass: 9 NOS/588,53 m
Intersection : 1 NOS
Motorway Service Area: 1 NOS
Completed Nos
Phase 2 B (Main body length approx. 306 km, between Existing Bursa Reinforcement Viaduct 2
Ring Road Karacabey - İzmir Karasuluk intersections) Belkahve Tunnel is
located in Phase 2 B. Underpass 28
Overpass 3
The construction and acceptance of 20 km section of Phase 2 B between
(Balıkesir-Edremit)-İzmir Kemalpaşa Karasuluk intersections has been Bridge 2
completed. It has been opened to operation since 8 March 2017. Box Culvert 98
Note: Kemal Paşa State Connection Road junction located within the Tunnel Construction (Belkahve) 1
abovementioned 20 km section was opened to traªc on 20 October 2015. Intersection 3
Amounts realized on the basis of main construction items for the
abovementioned 20 km section are as follows: Service Area -