Page 10 - World Of Nurol Magazine-27
P. 10

by  taking  place,  as  in  the  previous  years,  in  the  “Top
                                                                    250 International Contractors” list published by ENR-
                                                                    Engineering News Record research body and prepared
                                                                    based on the income obtained from abroad activities in
                                                                    2015. This success gained in spite of global ambiguity
                                                                    and problems in Libya and Iraq, two of our main markets,
                                                                    is critically important for our country.

                                                                    Activity field of Nurol Construction covers fifteen
                                                                    countries  on  a large  geography  including  Algeria,
                                                                    Morocco, United Arab Emirates, Saudi Arabia, Libya,
                                                                    Qatar,  Georgia,  Poland,   Russia,  Turkmenistan,
                                                                    Kazakhstan, Uzbekistan, Iraq and Afghanistan.

                                                                    Under the light of this general evaluation within and
                                                                    beyond the territories of Turkey which is a reflection
                                                                    of our quality and trust principles, we continue
                                                                    providing services with impressive large-scale projects
                                                                    in the sectors of construction, commitment, defense,
                                                                    manufacturing, real estate investments, energy, mining,
                                                                    tourism and finance.

                                                                    We have the proud of completing and putting into service
                    Distinguished Nurol Family,                     the “Osmangazi Bridge” under “Gebze-Orhangazi-Izmir
                    Dear Reader,                                    Project”, named as the biggest Build-Operate-Transfer
                                                                    Infrastructure  Project  of  the  history  of  the  Republic
                                                                    of Turkey in a single time. Osmangazi Bridge which
                    According to researches of Forbes and Capital   connects the Izmit Gulf to Hersek Headland from Dilova
                    Magazines, which closely monitor the economic   is the fourth bridge of the world and second bridge of
                    developments in the business world, in the first   Europe with the biggest central span, with a central
                    half of 2016, Nurol Company Group has ranked as  span of 1.550 meters and total length of 2.682 meter.
                                                                    We are very pleased to take part in this project which
                    • the 33  among the top 45 holdings in terms of   will reduce the travel time between Istanbul and Izmir
                           rd
                    turnover,                                       to 3.5 hours instead of 9.
                    • the 85  among the top 500 private companies
                            th
                    of Turkey,                                      Construction of South Approach Viaduct, which comes
                    • the 2  with an increase of 355% and 12.000    after Osmangazi Bridge and built by Nurol Group
                           nd
                    employment respectively considering the turnover   required advanced construction technology just as the
                    change of the last ten years (2006-2015) for the   suspension bridge. A total of 33.000 tons steel material
                    fifty-year and older companies and employment   was used in this viaduct of 1.380 m long.
                    data of 2015.
                                                                    Ilısu Dam and HEPP project which is unique in the world
                    Besides,  NUROL Construction,  which  celebrates   with 1.800 meter crest length among rock-fill dams with
                    its 50  anniversary, filled our Group with pride   concrete-covered frontal face exceeded the progress
                          th
   5   6   7   8   9   10   11   12   13   14   15