Göksu Hydroelectric Power Plant with the inten-  the Service Procurement way. Within the power plant,
                  tion of using of 80 meters drop as a river type is tak-  there are 30 dwelling houses for the accommodation
                  en into operation in 1959 and isolated on the Göksu  of its staff. The management of the power plant is now
                  River within the provincial borders of Konya.  Göksu  realised by the private sector with 16 employees.
                  Power Plant have 10,8 MW installed power and pro-
                  duces annually 65 million kWg energy on the average    For the purpose of privatization of total of 17 Hydro-
                  in a consistent way with its very high rate of capacity  electric Power Plants by way of Transferring the Right
                  utilisation.                                        of Operation, 10 Groups including Göksu HEPP were put
                                                                      out to tender by the Privatization Administration in July
                     Since Göksu HEPP project is a renewable energy re-  5, 2012 and as a result of the final bargain negotiations
                  sourced  project,  contributes  the  reduction  of  39.000  carried out in October 19, operation of Göksu HEPP was
                  tons CO  oscillation annually.                      undertaken for 49 years by Nurol Energy in exchange
                         2
                                                                      for 57,5 million USD.
                     Power Plant, which has a consistent production un-
                  til this time since it is put into use, has a steady flow   Following the approval of Competition Authority
                  regime by long years.                               and Privatization High Council, transfer of the power
                                                                      plant was completed successfully in March 2013. With-
                     Göksu HEPP has been run by the staff of Electric-  in the scope of Göksu HEPP, an investment is planned
                  ity Generation Company (EÜAŞ) since its foundation  to be made for the rehabilitation and the moderniza-
                  and then continued to be run by the private sector with  tion of some of the equipments and constructions.








                        Projects Features
                             Related to

                      Göksu Hydroelectric
                            Power Plant


                             Installed Power
                                 10,8 MW


                            Annual Production
                                 65 GWh


                                Net Drop
                                  79 m


                             Design Flow Rate
                                 16 m /s
                                     3

                          Type of the Power Plant
                             Type of the River


                             Annual Term of
                               Employment
                               6.000 Hours
                     (Average of Turkey’s Hydroelectric
                         Power Plant 3.500 Hours)