Page 19 - World Of Nurol Magazine-21
P. 19

we introduce the world of Nurol to the world






        NUROL CONSTRUCTION IS








        WAITING FOR CONDITIONS IN







        LIBYA TO TURN TO NORMAL















          WAITING FOR A START TO CONTINUE OUR PROJETCS

          Our projects in Libya were interrupted due to the current situation. But we wish to restart our activities in Libya
          which was our main focal point in Northern Africa before.
          As of end of 2010 our projects stand as listed below;

          1- Algarabolli Misurata Dual Highway Rehabilitation Project
          The project covering 160 km long dual section of coastal highway extending from Tripoli do the east was been
          brought to completion stage.
          2- Buildings of Al Fateh University Law and Economy Faculties
          In this project which was carried out under a turnkey contract including the design, it was anticipated to rich
          completion stage as of summer 2012.

















                                                           3- Al Fateh University Physical Education Faculty
                                                           Under the Physical Education Faculty Project which was again
                                                           run under a tight schedule, the faculty building with a closed area
                                                           of 22.000 m² was being realized under design-build contract.

                                                           4. Al Fateh University B Campus Infrastructure Works
                                                           All urban infrastructure and road works of Al Fateh University B
                                                           Campus area were been carried out as part of our project.