Can we recognize you in a few  When did you participate in the  You have completed the mounting
          words?  Please would you tell  Nurol Group?                                 of the largest part of  the Izmit
                                                                                      Bay Crossing  Southern Access
          us your education and business                                              Viaduct as a part of the Gebze-
          life thereafter?                      In October 2012, I joined the Nurol Group by   Izmir Motorway Project. Could
                                                getting  the  tender  of  the South  Approach   you give us some information
          Cengiz F. GÜMÜŞDAĞ, Project Manager, I was   Viaduct within the scope of the Gebze -   about the viaduct?
          born in 1975 in Ankara. After completing   Orhangazi - İzmir Motorway Project.
          the elementary education and high school                                    The Southern Access Viaduct which connects the
          in Ankara, I have completed my License   Before  our  questions  about  crossing to land, is approximately 1.4 kilometres
          Education  in Gazi University, Mechanical   Viaduct, what will you tell about   long. It consists of a one thousand four-hundred
          Engineer Department.                  the Gebze - İzmir Motorway            metre solid steel deck which sits upon 11 steel

          I’ve started my business life of the mechanical   Project that is the one of the   piers between  the two concrete abutments
                                                                                      on either side. By solid we mean that it was
          design of industrial facilities, I found the chance  Turkey’s and world’s largest   made without bolts, only by welding, and it is a
          to get experience in various fields such as   project?                      single piece. The main steel structure weighs 32
          planning, procurement, R & D, manufacturing,                                thousand 500 tonnes and connects the bridge
          and rection. With residence abroad on three   The  Gebze - Orhangazi - İzmir Motorway  deck at 60 metres high with the motorway deck
          continents almost five years, I took charge   Project  is the largest infrastructure Project  at 11 metres high.
          17 years, ten years of which in international   in the budgetary standpoint, of the world
          projects. I’m working as the Project Manager,  and is a good example for Turkey, with the    What can you say as regard
          from the Project of the Natural Gas Combined  Build-Operate-Transfer (BOT) Model and the   with  the  structural  design
          Cycle Co-Generation Power Plant built in  Izmit Bay Crossing Bridge is the heart of this   of the viaduct?  Would you
          Macedonia in 2009 until now.          Project.                              mention  about  its  sizes  and  the
                                                By being the persons who spent the last three  construction techniques?
                                                years of our lives in the region, we found the
                                                chance to live life in order to find out how that  Our design criteria has been made based on
                                                project is necessary for the region.  three earthquake possibility. It is calculated

                                                By means of two 252 meter high towers,
                                                erected with a distance of 1.550 meter apart
                                                from each other inside the sea, that bridge is
                                                the largest 4th bridge of the world, and the
                                                largest bridge of the Europe. That is 4.5 km
                                                long with its viaducts, ground to ground.

                                                In fact as another perspective, that is the
                                                realization of a 35 years long dream of which
                                                preliminary draft work has been done, to
                                                begin with, at the end of the 70s at the same
                                                location and then it might not realized due
                                                to the insufficiency of the technology that is
                                                able to overcome the seismic requirements of
                                                the region or due to financial inadequacy.
            Cengiz F. GÜMÜŞDAĞ, Project Manager