KİĞI DAM AND HEPP




               he Kiğı Dam and HEPP located at Bingöl is being
               realized under the investment of DSI. This plant
         Twill be installed on Murat River.  The fabrication
          and installation works of hydromechanical equipment is
          being carried out by NUROL STEEL within the scope of
          permanent mechanical equipment project.


          The fabrication work of penstock pipes of the project is
          started in the first half of year 2014 and the fabrication
          of them has already been completed.  Hydromechanical
          equipment  works  within  the  scope  of the  project  are
          continuing.  The plant will be put into operation at the
          end of 2015 and its annual production capacity will be 650
          GWh.                                                                                                                           EX-FACTORY FABRICATIONS

          The scope of the contract is including
          -      Radial gates and embedded elements                                                                                        n addition to the fabrication works in connection with NUROL STEEL’s own contracts, it is also performing the
          -      Gate Lifting Assembly and control assemblies,                                                                             fabrication and erection works for hydromechanical and electromechanical items being under the contractual scope
          -      Bottom Outlet valves & Gates and control                                                                               Iof foreign companies, such as Alstom, Voith and Andritz. “Spiral Case”, “Rotor Spider”, “Pit Liner”, “Generator Stator
                 mechanisms,                                        Y.KALEKÖY DAM AND HEPP                                               Frame”, “Draft Tube with Cone”, “Upper & Lower Bracket”, etc. are the examples of such works.
          -      Penstock pipe and steel supports,                                                                                       More specifically;
          -      Power plant traveling (mobile) crane and portal          ukarı Kaleköy Dam and HEPP, located  on Murat
                 (gantry) cranes                                          river at Bingöl, is being realized at the time of               ● 3 pcs 5.400 mm diameter Draft Tube and Cone of Yukarı
                                                                                                                                          Kaleköy Dam and HEPP, which are under the contractual
          -      Switchyard and cable channel steel structures
                                                                    Ycompletion.The total installed power of the plant                    scope of Voith Company, are being manufactured in two
                                                                    will be 625 MW and the annual production amount                       pieces. The fabrication of 3 units Spiral Case of Yukarı Kaleköy
                                                                    will be 1.505 GWh. The fabrication and installation of                Dam and HEPP are going on, as well. Pit Liner and Spiral Case
                                                                    Hydromechanical Equipment are performed by NUROL                      Pressure Test Gates projects are the works contract of which
                                                                    STEEL and it will be commissioned at the end of 2015.                 were recently awarded to NUROL STEEL.
                                                                                                                                          ●Artvin Dam and HEPP turbine, generator and switchyard
                                                                    The scope of the contract is including:                               equipment are the contractual responsibility of Alstom
                                                                    -      Spillway Cofferdam Gates and embedded                          Company, for 7 units. The Spillway Cofferdam Gates with
                                                                           elements and lifting beam,                                     1.500x5.500x1.6000 mm dimensions are being manufactured
                                                                    -      Spillway radial gates embedded elements and                    by NUROL STEEL. Currently the fabrication of 4 units of Tail
                                                                           lifting assembly,                                              water Gates are continuing and it is planned to be completed
                                                                    -      Energy inlet grates, service gates, cofferdam                  within the year of 2014.
                                                                           gates and embedded elements,                                   ● Yukarı Kaleköy turbine and generator project is under the
                                                                    -      Power Plant Building inlet pipe covers,                        contractual responsibility of Andritz Hydro Company. The
                                                                           embedded elements and gate lifting assemblies,                 fabrication of Stator Frame (being the most critical parts for
                                                                    -      Penstock pipe and accessories  Φ6.400, Φ2.200                  fixing the generator and rotors) are currently continuing. The
                                                                    -      Butterfly Valve                                                fabrication, which is performed in two pieces and at 11.500   connection with Çetin HEPP project being under the
                                                                    -      Conic Valve and                                                mm diameter, shall be delivered at the end of 2014.  Similarly,   contractual responsibility of  Andritz Company
                                                                    -      Portal (Gantry) Cranes                                         the derivation Entrance and Exit Tunnels Embedded Elements
                                                                                                                                          contract has been recently awarded to NUROL STEEL, in

       80                                                                                                                                                                                                                                                   81