Page 10 - World Of Nurol Magazine - 25
P. 10

UAE
































                                                                                                                                                                                                    Jumeirah













                                                                                                                                           nternational City Package 12 and Package 9
                                                                                                                                           projects have been successfully completed and
                                                                                                                                         Ihanded over to our Client in 2008, which were
                                                                                                                                         recorded as our primary references in Dubai.


                                                                                                                                         In addition to that, we have successfully
                                                                                                                                         completed the construction of 856 villas and
            RESIDENTIAL TOWERS FOR H.H. DR. SHEIKH                                                                                       town houses project in Jumeriah Village, Dubai
                                                                                                                                         in 2013 despite of the economical crises and we
                                                                                                                                         are at the final commissioning stage of the of
            SULTAN BIN KHALIFA AL NAHYAN IN ABU DHABI                                                                                    the Infrastructure Works Project over an area of
                                                                                                                                         400 ha at Jumeirah Park for the same Client in
            The scope of the Project including Two Residential                                                                           line with the re-structuring agreement  between
            Buildings  for  H.H.  Dr. Sheikh  Sultan  Bin  Khalifa                                                                       Nurol and Nakheel.
            Bin Zayed Al Nahyan at Plot # C104 & C105, Sector
            # E-48, Rawdhat, Abu Dhabi, UAE, includes the
            construction, completion and maintenance of the
            2 Residential Buildings including G+5, G+4 storey
            buildings over two storey underground car park
            structure with the Mechanical Rooms in top roof
            for each building. Total Construction area is 21.878
            m  to be constructed in line with sustainable
              2
            building code of Estidama Perl 1 rating of Urban
            Planning Council of Abu Dhabi.

              n a challenging fast track construction period, the
              construction  works has  started on  September
           I22nd,2014, and project to be completed
            within 487 calendar days of duration including
            mobilization, testing and commissioning works.
       12                                                                                                                                                                                                                                                   13
   5   6   7   8   9   10   11   12   13   14   15