Page 15 - World Of Nurol Magazine - 25
P. 15
UAE
There will be controlled safety points at the
entry and exit of the tunnel and the whole
SAADIYAT ISLAND Service Tunnel tunnel route shall be controlled by High Secure
Scanning Facilities (SSF). Furthermore the
tunnel is designed for a service life of 100 years.
ur Project at Saadiyat Island Cultural
Development Region of Tourism
ODevelopment and Investment
Corporation (TDIC) located at Abu Dhabi, capital
of United Arab Emirates (UAE) continues
successfully under the project management
of Turner Consultancy Company as the Client’s
representative as a design and build contract.
The project started at the beginning of this year,
engineering and design works were completed
in two months and construction activities have
begun.
his is a open-cut tunnel Project which
has been designed to provide services to
TGuggenheim Museum, Louvre Museum,
Zayed National Museum and Shopping Centers
of which constructions are continued at Saadiyat
Island. Design and construction of concrete box
tunnel by using sheet pile temporary shoring
system including dewatering 10 meter below sea
water level is constructed by Nurol LLC’s own
sources. About 1.500 meter long underground
service tunnel is planned to be completed by
November 2015.
16 17