Page 15 - World Of Nurol Magazine - 25
P. 15

UAE








































                                                                       There  will  be  controlled  safety  points  at  the
                                                                       entry and exit of the tunnel and the whole
 SAADIYAT ISLAND Service Tunnel                                        tunnel route shall be controlled by  High Secure

                                                                       Scanning Facilities (SSF). Furthermore the
                                                                       tunnel is designed for a service life of 100 years.


 ur Project at Saadiyat Island Cultural
 Development  Region  of  Tourism
 ODevelopment  and  Investment
 Corporation (TDIC) located at Abu Dhabi, capital
 of United Arab Emirates (UAE) continues
 successfully under the project management
 of Turner Consultancy Company as the Client’s
 representative as a design and build contract.
 The project started at the beginning of this year,
 engineering and design works were completed
 in two months and construction activities have
 begun.

 his is a open-cut tunnel Project which
 has been designed to provide services to
 TGuggenheim  Museum,  Louvre  Museum,
 Zayed National Museum and Shopping Centers
 of which constructions are continued at Saadiyat
 Island. Design and construction of concrete box
 tunnel by using sheet pile temporary shoring
 system including dewatering 10 meter below sea
 water level is constructed by Nurol LLC’s own
 sources. About 1.500 meter long underground
 service tunnel is planned to be completed by
 November 2015.



 16                                                                                                                        17
   10   11   12   13   14   15   16   17   18   19   20