Page 44 - World Of Nurol Magazine-23
P. 44
ORDU
HIGHWAY
CONSTRUCTION
NATIONAL ripheral Highway, realized by the joint ► Length 19,1 Km
Construction works of the Ordu Pe-
venture led by Nurol as a result of the
tender won, have started in 2012. Some
characteristic properties of Ordu High-
way having an estimated cost of 409
44 Million TL are as follows: ► Number of lanes 2x2