Page 25 - Engilish 2015 Annual Report
P. 25
Osmangazi Bridge, Dilovası/Kocaeli-Altınova/Yalova/TURKEY Sulaymaniyah Silo Project, Sulaimania/IRAQ
Progress in our Ordu Ring Road Project has reached the level of The civil works are also in progress in our NUROL Life
80% realization rate as of 2015 and the Employer has granted us Multipurpose Complex and NUROL Park projects
a 20% additional contract. The construction works at Ordu implemented in Istanbul as NUROL Group investments. A
Peripheral Highway Project have exceeded %80 as of 2015. multi - floor complex with a total of 138.000 m closed area
2
There are 3 double tube tunnels with a total length of 6,5 km, 4 is being built under our NUROL Life Project and nine multi
viaducts with a total length of 2,4 km, 3 bridges, 5 intersections - purpose blocks with a total 273.000 m closed area are
2
in the 21,4 km long 2x2 lane Ordu Orbital Highway. being constructed under NUROL Park Project on turn - key
basis.
The works are in progress in our NUROL Tower Çağlayan
Business Complex Project implemented on the land owned Through its works briefly mentioned above, NUROL
by our Group as a result of the tender awarded to us and our Construction and Trading Co. Inc. is carrying the justified
project has been completed as of 2016. The complex was pride of its successful history to the future with a young
constructed on a 6.800 m project area and consists of 70.500 m and dynamic spirit which it has not lost since the very first
2
2
closed area. say of its foundation.
NUROL CONSTRUCTION AND TRADING CO. INC. (Thousand TL)
2013 2014 2015
TOTAL ASSETS 2.747.989 3.118.976 4.925.308
TOTAL EQUITY 739.513 813.072 1.633.617
INCOME FROM SALES 1.251.311 1.784.437 2.227.028
EBITDA 206.487 243.854 308.602
Southern Approach Viaduct, Altınova-Yalova/TURKEY Souk Tleta Barajı, Tizi Ouzou/CEZAYİR Figures are taken from the audited consolidated financial statements in accordance with IFRS.
24 25