Ilısu Dam & HEPP, Mardin/TURKEY Gebze-Orhangazi-İzmir Motorway, Gebze-Orhangazi Section, Orhangazi/TURKEY
The field of activity in the context of the reference project The operations in parallel to the graphic achieved with this approach viaducts, will be in operation as of 2016 within the In Algeria, which is another country where we carry out our
portfolio of NUROL Construction Co., which is included in the successful history are continuing at full speed with the ongoing scope of our Project which involves the design and construction activities, our latest Motorway Project Linking Tizi – Ouzou
list of Top International Global Contractors published by domestic and overseas projects. of 425 km highway. The construction of 1.378 m long South with East - West Highway is ongoing. This project, consisting
“Engineering News Record” (ENR.com) of Mc. Graw Hill of Approach Viaduct of the suspension bridge that involves of the construction of 48 km long motorway together with a
USA, covers the infrastructure projects, highways, motorways, In our Gebze - Orhangazi - Izmir Motorway Project (including manufacturing of 35.000 tons of steel structure was completed well a 2x2,7 km long tunnel and 2x10 km long viaduct as
railways and metro systems, tunnels, gas / petroleum pipelines Izmit Bay Suspension Bridge Crossing and Connection Roads), as of the end of May 2016. Furthermore, 9 km motorway section bridge structures has been going on in accordance with work
and related facilities, irrigation / drainage systems, dams and which is one of the biggest infrastructure investments of Turkey between Km: 34+350 and 43+296 under the responsibility of schedule.
hydroelectric power plants, water supply and sewage systems, based on Build - Operate - Transfer model, the construction NUROL has been completed and currently in service.
urban / industrial treatment facilities and solid waste facilities, activities have been continuing both in the suspension bridge Implementation of another 93 km between 224+300 and
turnkey manufacturing facilities, industrial complex projects, section and at the motorway section. A section with a length of 317+284 which is under the scope of the same project,
industrial sites, business and trade center projects, luxurious / 53 km between Gebze (K1 Intersection) and Gemlik (K5 commenced during 2015 and continues as planned. Gebze-Orhangazi-İzmir
mass housing and social center projects and hotels, holiday intersection) including İzmit Bay suspension Bridge,having a
villages and tourism facilities. mid-span of 1550 m with a total length of 4500 m together with The percentage of completion is nearly more than 80% in
Ilısu Dam and HEPP Project, which is under construction by Motorway
an international consortium under the leadership of NUROL
as a concrete faced rockfill dam with 24 million m dam body (Including Osmangazi Suspension Bridge and Connection Roads)
3
supposed to generate 4,1 billion kWh energy per annum with It is one of the largest infrastructural
1.200 MW capacity. Additionally, Construction Works of projects in Turkey implemented
Hasankeyf Highway Bridges have been continuing within the
framework of our Hasankeyf Group Highway Bridges Project, as Build-Operate-Transfer model.
the contract of which has been signed as a result of the
tender awarded to NUROL. Three bridges with different spans
are being built under this project.
Our MARMARAY Bosphorus Tube Crossing Project, which is Construction works in Souk Tleta and Boukhroufa Dams are
one of the major infrastructure projects of Turkey linking both continuing within the frame of their schedules in addition to our
sides of Istanbul through an undersea immersed tube rail Douera Dam Project which is completed and handed over as of
tunnel, is being implemented by a Turkish - Japanese Joint this year. Both dams are earth fill with clay core type and Souk
Venture, in which NUROL is among the local partners. This Tleta Dam will have 1,5 million m dam body volume and
3
project has entered into operation as of October 2013 and the 98 million m irrigation and drinking water supply capacity
3
works are being completed within the framework of the whereas Boukhroufa Dam will have 4,3 million m dam body
3
3
Ilısu Dam & HEPP, Mardin/TURKEY warranty period of the project. volume and 125 million m irrigation and drinking water capacity.
20 21