Page 23 - Engilish 2015 Annual Report
P. 23
In Morocco, provisional acceptance has been granted to at our Furthermore in Abu Dhabi, our construction works are being
82 km long highway project with motorway standards, carried out rapidly within the scope of our residential complex
consisting of Lots 3 and 4 of Al Jadida-Safi Motorway as of project contracted in October 2014 by the employer H.H. DR.
March 2016. Sheikh Sultan Bin Khalifa Al Nahyan Private Administration. The
project , covering two residential blocks, will be completed by
In Baghdad, Iraq, our Al Sadr City Stadium Complex Project
2016. Another contract for Fairmont Hotel Administrative Staff
consisting of design and turn - key construction of a 30.000 seat
Housings project which will be constructed in Dubai by the
capacity stadium, 2.500 seat capacity training fields and hotel same employer, is expected to be signed within 2016 and will
facilities, has come to the final stage with the completion of all consist of two residential blocks.
the works handed over by the Employer.
In Qatar, where we have been carrying out activities over a
In Sulaymaniyah, Iraq, the construction activities related to our decade in the Gulf Region, our business development activities
Silo and Warehouse Complex Project has been completed and are in progress.
provisional acceptance was received. The design and
construction of an 80.000 tons capacity silo complex and 12 In Libya, which is the last country in our field of activity in North
warehouse buildings have been realized within the scope of Africa, our activities were, unfortunately, suspended due to sad
this project. events experienced in the country and we are currently spending
our efforts to resume our work within the framework of our
The Gulf Region maintains its position to be an important focal Coastal Highway Algarabolli – Misuratah Section Project
point for NUROL Construction Co. Among our projects in Abu including the rehabilitation of 160 km long dual highway, Tripoli
Dhabi, Bab Al Qasr Hotel and the Multi - Purpose Tourism Al Fateh University Economy and Law Faculties, Physical
Complex Project have reached the completion phase as of 2016. Education Faculty and Campus B Infrastructure Works Projects.
The complex that includes offices, luxurious residences and
social facilities is composed by twin towers with 41 floors each In Georgia Paravani, our HPP project with installed capacity of
2
and the total construction area shall reach 165.000 m . 104 MW was completed in 2015. In Batumi, Sheraton Hotel,
which we successfully completed its construction in the past,
Nurol Life, Seyrantepe/İstanbul/TURKEY Nurol Tower, Mecidiyeköy/İstanbul/TURKEY Saadiyat Island Museums region transportation tunnel project, is currently under operation by our company. Our business
also located in Abu Dhabi, has been successfully completed. development efforts in the region are still aiming to expand
Under the scope of this project, a 1,5 km long highway tunnel in full speed.
has been designed and built.
Our business development activities the scope of our overseas
Additionaly, our activities within the framework of the Marina activities are rapidly progressing. In addition to our initiatives in the
City Villas project, the contract of which was signed by NUROL Gulf Region and mainly in Saudi Arabia, UAE and Kuwait, we are
Construction Co. as a result of the tender awarded are continuing also carrying out our activities in various countries in Sub-Saharan
in accordance with the schedule. Various types of villas and Africa, Bosnia-Herzegovina, Macedonia, Serbia, Kazakhstan,
residences with a total closed area of 120.000 m shall be Azerbaijan, Pakistan and Ukraine.
2
constructed within the scope of this project.
Nurol Park, Güneşli/Istanbul/TURKEY Motorway Connection to Tizi Ouzou, Tizi Ouzou/ALGERIA
22 23