Page 39 - Annual Report 2019
P. 39

ackground;                                        and Phase II A as well as funding required for Phase II B
              the tender for Motorway Project for Gebze -       have been secured with a new loan package amounting to
        BOrhangazi - Izmir (including İzmit Bay Crossing and    4,956 billion USD. The total investment amount for the
         Connection Roads) was conducted on 9 April 2009 and the   entire project is estimated to be 7,2 billion USD, funded
         proposal submitted by Nurol - Özaltın -Makyol - Astaldi -   from 4,956 billion USD debt, 1,4 billion USD equity and
         Yüksel - Göçay Group was selected as to be the best    800 million USD net early operational revenue. As of the
         proposal with 22 years and 4 months construction and   end of December 2019, approximately 7,13 billion USD has
         operating period.                                      been spent towards project costs, divided as follows:
                                                                Phase I 2,80 billion USD, Phase II A 770 million USD and
         OTOYOL YATIRIM  VE İŞLETME  A.Ş. was founded on 20     Phase II B 3,56 billion USD.
         September 2010 to perform the works of construction,
         operation and transfer of Gebze - Orhangazi – Izmir (including   Turkish Lenders;
         İzmit Bay Crossing and Connection Roads) Motorway Project   Akbank, Finansbank, Ziraat Bankası, Garanti Bankası, Halk
         through Build - Operate - Transfer model.              Bankası, İş Bankası, Vakıflar Bankası, Yapı ve Kredi Bankası.
         The project implementation agreement was signed        Foreign Lenders;
         between the General Directorate of Highways and OTOYOL   Deutsche Bank, Saudi National Commercial Bank, Bank of
         YATIRIM VE İŞLETME A.Ş. on 27 September 2010.          China, Siemens Bank.
                                                                Project and Route
         The ceremony for start of construction works in Gebze for
         Gebze - Orhangazi - Izmir Motorway Project took place on   The advantage to be provided by shortening of distance 140
         28 October 2010 in Dilovasi district of Kocaeli Province and   km  in comparison to  current state highway have been
         Ceremony for start of construction works in İzmir was held   estimated and as  a result it has been foreseen that the travel
         in Alsancak Cumhuriyet Square on 27 February 2011.     time between İstanbul-İzmir which is 8-10 hours now, will
                                                                decrease to 3,5 – 4 hours
         İstanbul - Bursa - İzmir    Motorway Phase I, Intersections
         between Gebze and Gemlik (including Osmangazi Suspension   The starting point of the project is Gebze and the Motorway
         Bridge) have been opened to traffic on July 1, 2016.   crosses İzmit bay located between  Dilovası and Hersek
                                                                through a Suspension Bridge of approx 3.000 meters length,
         The construction and acceptance of Phase II A (Gemlik -   then will extend to Orhangazi and Gemlik and be connected
         Bursa) were completed and opened to traffic on 12 March   to Bursa Ring Road at Ovaakça intersection.
         2017 with the opening ceremony.
                                                                Following the Bursa Ring Road which is already operational,
         As the part of Phase II B, acceptance and the start of the   the Motorway reaches Balıkesir starting with Bursa -
         commissioning between Saruhanlı-Kemalpaşa Intersections   Karacabey intersection and continuing through the north of
         were on December 1, 2018, Balıkesir North-Balıkesir West   Susurluk. It continues south from the west of Balıkesir, ahead
         and  Akhisar-Saruhanlı Intersections were on March 17,   via Savaştepe, Soma, Kırkağaç districts and continues
         2019, Bursa West – Balıkesir North and Balıkesir West-  towards the west near Turgutlu. It moves along  paralel to
         Akhisar Intersections were on August 4, 2019.          İzmir - Uşak state highway  and finally connects with Anadolu
                                                                Lisesi intersection over the İzmir ring road.
         Otoyol  Yatırım ve İşletme A.Ş.
         Procured services such as gulf soil surveys, motorway   The project has a total length of 426 km including a
         route soil surveys, signature of Motorway and Suspended   highway length of 384 km and an access road length of 42
         Bridge construction contract and design works, legal   km. Along the route, there are 38 viaducts with a total
         infrastructure studies and project consultancy services for   length of 21.571 m, including The Northern / Southern
         the motorway project and performed activities required   Approach Viaducts, 3 tunnels with a total length of 6.446
         for preliminary preparation activities in physical aspects   m, 179 bridges, 20 toll collection areas, 22 intersections, 4
         and project financing.                                 Highways and 2 Tunnel Maintenance-Operation Centres,
                                                                as well as 17 Service Stations and Parking Areas.
         The Project financing for Phase I (from Gebze to Gemlik
         Intersection including the Osmangazi Suspension Bridge)
         and Phase II  A (from Gemlik Intersection to Bursa
         Intersection)  were completed in the first quarter of 2013
         and in the second quarter of 2014, respectively.
                                                                 OTOYOL YATIRIM VE İŞLETME A.Ş. (Thousand TL)
         The process of refinancing this debt to extend the maturity
         and secure required additional funding of 3 billion USD                          2017     2018    2019
         for Phase II B (from Bursa Intersection to İzmir) was   TOTAL ASSETS           23.284.502 35.897.304 44.888.759
         completed by signing the  finance documents on June     SALES INCOME            5.499.165 6.292.385 7.051.936
         05,2015. Thus, the funding required for the entire project   EBITDA             2.032.715  3.184.169  4.259.361
         in the form of refinanced loan of 2 billion USD for Phase I   Figures are calculated from the consolidated financial statements in accordance with IFRS.