Page 56 - World Of Nurol Magazine 35
P. 56

APRIL 2024      35. ISSUE




          CONSTRACTION  NEWS



         TÂRGU MUREȘ - TÂRGU NEAMȚ MOTORWAY, SECTION I DESIGN
         AND CONSTRUCTION WORKS OF TÂRGU MUREȘ - MIERCUREA
         NIRAJULUI AND A3 MOTORWAY CONNECTION




         The project which is located in Mureş/Romania, includes   with a total  length of 343 m and 4 highway underpasses.
         1 Operation and Maintenance Center, 2 Service and    Project duration is 30 months of which 6 months is  for
         Parking Areas and 3 intersections. It is a highway project   design and of 24 months for construction. The contract
         with a main route length of 22 km consisting of 4 lanes   price  of  the  project,  whose  financing  will  be  provided
         with a platform width of 26 m and a total of 25.7 km of   from the European Union Funds, is 494 million EUR. Nurol
         connection roads with 9 m width, including 30 precast   İnşaat was invited to sign the contract in February, 2024.
         bridges with a total length of 2,588 m, 2 steel bridges

































































         56
   51   52   53   54   55   56   57   58   59   60   61