At the 25 Km Section to the Gemlik Junction - Bursa ring road, the motorway  are completed and within the scope of  the electric - electro mechanic
        construction studies are intensively ongoing, the mobilization activities at  works, the construction of generator and the tunnel control center,
        the motorway sections between Bursa and İzmir are completed within the  installation of fire detection systems, closed circuit television system
        scope of Phase II B.                                       mounting are completed and the construction of the facilities oriented
                                                                   to  operation has been commenced.
        The works are completed in 1 of the tunnel among 3 that took part in the
        project and in the other 2 tunnels it has gotten ahead extensively in the  While approximately 80 % of excavation activities In the Selçukgazi
        other 2 tunnels.                                           Tunnel located between the Gemlik Junction - Bursa are completed;
                                                                   in the Belkahve Tunnel that took part at the İzmir Province Bornova
        In the Samanlı tunnel, which is total 7.020 meter long, constituted from  district the excavation activities are completed as 100 % and electric -
        3.534 meter right tube and 3.486 meter left tube has assumed the title of  electro mechanic  works are commenced.
        the longest motorway tunnels of our country, the construction activities