xcavation studies of Öceli tunnel (2.010 meters
                                                                                                                                                                                                           x 2) within the scope of Ordu Beltway project
                                                                                                                                                                                                     Eof which the construction is undertaken by our
                                                                                                                                                                                                      company have been completed with the combination
                                                                                                                                                                                                      of two tubes on 14 March 2014. Excavation and final
                                                                                                                                                                                                      concrete coating works are going on in Boztepe (3.300
                                                                                                                                                                                                      meters x 2 ) ve Terzili (1.180 meters x 2 ) tunnels.

                                                                                                                                                                                                      Ordu Beltway of which the  construction is under
                                                                                                                                                                                                      taken by Nurol - Yüksel - Özka - YDA Partnership
                                                                                                                                                                                                      shall be constructed as a complementary part of
                                                                                                                                                                                                      Black Sea Coastal Road in conformity with the
                                                                                                                                                                                                      purposes  of  meeting  the  standards  required  for
                                                                                                                                                                                                      transit traffic and reducing the urban traffic.

                                                                                                                                                                                                      Ordu  Beltway  Project  which  is revised  by changing
                                                                                                                                                                                                      the route, separates from Akçaova River and passes
                                                                                                                                                                                                      under Boztepe by a tunnel and passes Civil Creek,
                                                                                                                                                                                                      Melet River and Turnasuyu by a viaduct and then
                                                                              JOLLY                                                                                                                   connects to the coastal road ahead of Turnasuyu

                                                                                                                                                                                                      River. With the change in the route, the total length
                                                                                                                                                                                                      of the project has reached from 19,1 to 21,4 km.


                                                                                                                                                                                                      On the Ordu Beltway which will be constructed as 2x2
                                                                           ROAD                                                                                                                       m divided road with 26 m platform width, 4 viaducts
                                                                                                                                                                                                      which are 2.478 in length in total, 6 (double tube)
                                                                                                                                                                                                      tunnels which are 18.529 m in length, 6 junctions in
                                                                                                                                                                                                      total of which 3 is interchange, bridge which is 30
                                                                                                                                                                                                      m in length, 9 underpass bridges which are 287 m
                                                                                                                                                                                                      in length and 46 box culverts which are 2.160 m in
                                                                                                                                                                                                      length.
                                                 of COAST                                                                                                                                             Until today, 60 % of the project has been completed



                                                                                                                                                                                                      on the basis of contract estimate, of which the
                                                                                                                                                                                                      construction has started in 20.03.2012.