NUROL STEEL
DOMESTIC
ARTVİN DAM AND
HYDROELECTRIC
POWER PLANT
rtvin Dam and HEPP, which will have an
installed capacity of 332 MW, is on the
Çoruh River. Nurol Steel carries out the
manufacturing and installation of the
Apenstocks, which is 4500 mm - 6000 mm
diameter and weighs 1100 tons in total, of the Artvin HEPP
that is an investment of the Dogus Electricity Generation
Inc. and will start to operate at the end of 2015.
İZMİT BAY BRIDGE
SOUTH ACCESS VIADUCT
he Nurol Steel from the Nurol Construction, the
main contractor of this work, has undertaken the
Steel Manufacturing and Installation of the İzmit
Bay Drawbridge South Access Viaduct within the
Tscope of the Gebze-Izmir Motorway Project, the
construction of which is undertaken by the NÖMAYG for the
investor, Motorway Inc.
Within the scope of the project, there are 11 units of
steel legs, the hight of which rises up to 47 metres, and
there is a fixed steel deck of 36 metres in width and
1400 metres in length on these steel legs. The detail
design of the work, which will be 33.000 tons in total
when it is fully completed, is about to be completed.
The facility infrastructure of the installation site at the
beginning of the viaduct, where the pre-manufactured
steels, which have been made by our sub-contractors
who are the owners of the shipyard and facilities in
the region, will be assembled, has been completed,