Page 41 - World Of Nurol Magazine-21
P. 41

Nurol nationwide







                       NUROL MACHINERY
                             EJDER 6X6 IS IN KUWAIT





                                                   AFTER GEORGIA











































                                     FIRST TURKISH COMPANY WHO DESIGNED AND MANUFACTURED AN AWPC

                                     Nurol  Machinery  is  proud  of  being  the  first Turkish  company  who  designed  and
                                     manufactured  an  Armoured  Wheeled  Personnel  Carrier(AWPC).  It  is  known  that
                                     the export of seventy Armoured Wheeled Personnel Carrier (EJDER 6X6) to Georgia
                                     by Nurol Machinery is the first export of Turkey in this field. After t Georgia Project,
                                     this time EJDER has been invited to the tests which will carry out for the Armoured
                                     Personnel Carrier Vehicle Tender by Amiri Guard and Land Forces of Kuwait.

                                     There was very little time for Nurol Machinery to adapt his existing Georgia vehicle
                                     to the desert conditions of Kuwait and to succeed in internal tests. The personnel of
                                     Nurol Machinery have reviewed all of these issues and prepared the vehicle according
                                     to the new conditions in this very limited time while competing with other vehicles
                                     from different countries, to keep NUROL’s name on top.

                                     On the day of 10th September 2011, a team from Nurol Machinery was sending the
                                     vehicle from Esenboğa and another team was already waiting in Kuwait for the arrival.


                                     6 of the 19 invited vehicles by Kuwait authorities were succeeded in participating
                                     the tests. The most important reason for low number of participants was too short
                                     preparation time which made many companies faced with difficulties while preparing
                                     the vehicles with requested configurations and transportation to the testing area.
   36   37   38   39   40   41   42   43   44   45   46