COMPLETED PROJECTS and PROJECTS in PROGRESS
 COMPLETED PROJECTS and PROJECTS in PROGRESS  COMPLETED PROJECTS and PROJECTS in PROGRESS



 Contract  Date of   Date of                                     Contract  Date of   Date of
 Project Name  Client  Job Description  Project Name  Client                             Job Description
 Amount  Contract  Completion                                    Amount   Contract  Completion
 Piping Spool Prefabrication and Site Fabrication   Atak Engineering Construction Ind.
 BTC Crude Oil Pipeline Project, Pump Station, Piping Spool   Tepe Construction Inc.   5,062,955 $  19/02/2004  30/11/2004  Works of 2 Each Pump Station and 1 Each Pig   Ashgabat Textile Plant   And Trade Limited Company   2,420,832 $  10/02/1998  30/04/1998  Steel Construction Manufacturing (151 Tons)
 Prefabrication and Site Fabrication
 Station 80.000 Inç-Dia Welding Works
          İzmir Bus terminal                Obitaş A.Ş. Altes A.Ş.  7,447,953 $  03/07/1998  30/11/1998  Steel Construction Manufacturing and
 9 Each Vertical Relief Tank With Internal                                               erection Works (368 ton)
 Various Tank Fabrication and Erection Works For BTC Crude Oil   Tepe Construction Inc.   2,669,167 $  17/03/2004  30/06/2005  Floating Roof, 8 Each Fire Water Tank, 14   Stand Engineering / Stand   Steel Construction Manufacturing and
 Pipeline Project   Each Horizontal Cylindrical Fuel Oil Tank,   Beşiktaş Liberty Monument  968,612 $  12/02/1999  31/03/1999
 Total 2285 Tons.                           Mühendislik                                  Erection Works, ( 55 tons)
                                                                                         Roof  Steel Construction Manufacturing and
 5 Each Side Stream Filter Tanks Fabrication   Nurol Holding, Maslak Plaza   Nurol Group of Companies  1,437,091 $  22/02/1999  31.04.1999
  Filter Tanks Fabrication   PETKİM  295,606 $  16/06/2007  30/11/2007                   Erection Works (58 tons)
 and Testing
 Stainless Thermal Vacum Chamber (For Space   Sheraton Hotel  Nurol Group of Companies  376,635 $  02/01/2004  30/03/2005  Fabrication and Erection Works of  Various
 TAI  Stainless Thermal Vacum Chamber (Space Simulator)   TUSAŞ A.Ş.  827,512 $  02/03/2009  01/08/2011  Structural Works ( 230 Tons )
 Simulator) Manufacturing
                                                                                         Steel Structure Manufacturing, Erection and
 Mechanical  Installation Works ( plumbing, heating-  Eskişehir Anka Ceramics Factory   Nurol-Zeman A.Ş.   2,258,929 $  06/03/2006  01/12/2006
 Electromechanical works  of FNSS Defence Systems  of   coolling  installation,air conditioner, fire fighting   Cladding Works
 R&D Building, Welding Workshop, Assembly Workshop and   SGO Construction Ind. and  1,164,470 $  10/05/2012  16/03/2013  installation, natural gas installation and otomatic  control   Structural Steel Construction Beam and
 Limited Inc.
 Loboratuary Buildings Construction Project   Insallations and assembly works. ), R&D Building and   Tbilisi Police Department Building   Nurol Construction Inc.  2,932,280 $  25/10/2007  30/04/2008  Column Fabrication (1290 Tons)
 Workshops Steel Fabrication and Erection Works
          Ankara - Sıhhıye Bridge           Rona Machinery Co.   2,845,578 $  17/06/1997  30/10/1997  Bridge  Steel Construction Manufacturing and
 SUB TOTAL  564.708.259 $                                                                Erection  (350 Tons)
                                                                                         Bridge  Steel Construction Manufacturing and
          Adana Seyhan River Bridge and Rail Transport System  Alsim-Alarko Co. Inc.  13,908,878 $  03/05/1999  29/02/2000  Erection, ( Span 181 Meters and 818 Tons)
 ENVIRONMENTAL PROJECTS                                                                  6 Each Bridge Fabrication and Erection Works
 Electrofilter Rehabilitation In Soma TPP Unit 1 And 2  EUAŞ  6.723.090 $  16/08/2005  06/03/2007   Electrofilter Rehabilitation for Unit 1 and 2   Tajikistan Shkev-Zigar Road Project  Oyak Construction Inc.  659,381 $  22/01/2004  25/02/2005  ( 380 Tons )
 Electrofilter Rehabilitation In Seyitomer TPP Unit 1 and  EUAŞ  13.239.995 $  16/08/2005  22/01/2008  Electrofilter Rehabilitation for Unit  Steel Const. Manufacturing & Erection of
 2, Unit 3, Unit 4   1, 2,3, and  4   Ashgabat Kopet Mountain Stadium  Mensel  JV  22,684,995 $  14/03/1997  20/01/1998  Closed Stadium Tribune Pipe Construction
 SUB TOTAL  19.963.085 $                                                                 ( 983 Tons)
                                                                                         Steel Construction  Manufacturing & Erection of
          Ashgabat - 2 Stadium              Mensel  JV           9,802,286 $  01/11/1999  31/05/2000
                                                                                         Closed Stadium Tribune Pipe Construction
 CRANES                                                                                  Closed Sports Hall and Various Steel Works, Design,
          Ataköy Sports Hall                Murat Construction Inc.  41,609,026 $  01/07/1999  01/06/2001
 Crane Girder Fabrication Works  Asmaş A.Ş.  294.863 $  05/11/2003  30/04/2004  Crane Girder Fabrication Works  Supply, Manufacturing and Erection Works.
 Mersin Port Container Crane Erection Works   Liebherr  1.044.490 $  12/10/2004  11/02/2005  Erection Works of Two Each Container Crane   Al Shaqab Academy Arena Project  Leighton Contracting (Qatar) WLL   28,314,259 $  05/09/2006  01/11/2008  Structural Steel  Fabrication, Manufacturing
                                                                                         and Erection (11.700 Tons)
 8 Each Cranes, Total 16 Girders Fabrication
 Gama Crane Beam Fabrication Works  GAMA Industry Inc.  631.527 $  03/05/2007  19/09/2008  Mechanical  Installation Works ( Plumbing,
 and Pre-Erection
          Batumi Nurol Residence            Nurol Construction Inc.  323,621 $  01/12/2010  22/07/2011  heating installation, Natural gas installation,
 1.970.880 $                                                                             mechanical piping and assembly works. )
          Marmaray Railway Bosphorus Tube Tunnel and Station Project.  Gama - Nurol Joint Venture  163,405 $  13/01/2011  14/02/2011  Steel segments fabrications.
 AIRPORTS-HANGARS                                                                        BC1 Contract Ayrılıkçeşme Railway Bridge
          Marmaray Railway Bosphorus Tube Tunnel Project.  Gama - Nurol Joint Venture  305,844 $  15/02/2011  30/09/2011  Steel Fabrication and Erection Works
 Bodrum Airport Terminal Building   Eko Construction Co.  5.287.967 $  01/07/1997  30/08/1997  Steel Construction Manufacturing (350 Tons)
                                                                                         BC1 Contract Yedikule Railway Bridge Steel
 Steel Construction Manufacturing and   Marmaray Railway Bosphorus Tube Tunnel Project.  Gama - Nurol Joint Venture  232,411 $  11/03/2011  30/09/2011
 Nurol  Air, Hangar Building   Nurol Aero Inc.  2.216.940 $  05/12/1997  22/05/1998      Fabrication and Erection Works
 Erection (165 Tons)
          Pal Structural Carrier Test System Integration   TAI TUSAŞ  173,650 $  19/08/2011  25/05/2012  Viril Tower Manufacturing and Assembly
 Steel Construction Manufacturing and
 Atatürk Airport New Terminal Building    Tepe Akfen Vie JV   192.125.295 $  06/06/1998  31/12/1999  Stock Area Penthouse Manufacturing and Assembly  FNSS Defence System Inc.   181,173 $  03/02/2012  20/08/2013  Addition of Warehouse Building
 Erection Works, Design (7.256 Tons )
 Roof Steel Construction Fabrication Works  FNSS Savunma Sistemleri A.Ş. / Manufacturing and
 Dubai - New Emirates Airplane Hangar   Tepe Akfen Vie JV   4.009.167 $  02/01/2004  20/02/2005  SGO Construction Ind.
 ( 4.900 Tons )  Assemblies of  Steel Structure Buildings ( R&D and Variously   and Limited Inc.  451,137 $  18/04/2012  20/10/2013  Steel Building Manufacturing and Erection
          Workshop Buildings )
 Steel Construction Manufacturing and
 Esenboğa Airport New Terminal Building   Tepe Akfen Vie JV   7.304.197 $  26/04/2005  22/08/2006
 Erection Works  Adana Tufanbeyli Power Plant    SKEC Engineering and Construction   914,549 $  06/05/2012  30/03/2013  Fabrication of Underground Tanks and Pipe
 SUB TOTAL  210.943.566 $                                                                Spools Inside The Cooling Tower
          Isdemir Melthshop Factory, 28-40 crane girders construction of   İskenderun Iron & Steel Co.   195,196 $   27/07/2012  30/03/2013  Crane Girder Fabrication Works
          A-B Hall
 STRUCTURAL STEELS ( BUILDINGS, BRIDGES, STADIUM AND SPORT FACILITIES )  İzmit Bay Bridge South Approach Viaduct Project  NOMAYG JV   108,398,112 $  01/09/2012  In Progress   Steel Bridge Fabrication and Erection Works.
 Stainless Steel Construction Manufacturing                                              Steel Strucrural  Manufacturing and Erection
 TEAŞ Orhaneli Thermal Plant, Desulphurisation System   Teknotes-Noell JV   10,559,934 $  10/07/1995  30/06/1997  (116 Tons ), Steel Structure Manufacturing  Baghdad-Medinet Sadr Olympic  Stadium and Hotel Project   Nurol Construction Inc.  6,200,000 $  02/01/2013  22/12/2014  and Electro Mechanical Works
 ( 1606 Tons )                                                                            Grain silos and warehouses (60x20x7.5m)
 Roof Steel Construction Fabrication and                                                 have been built at Peramagroon and Hwana.
 Baku - Tibilisi - Ceyhan Oil Pipeline Crude Oil Pipeline Station.   Tepe Construction Inc.   3,242,649 $  08/06/2004  30/06/2005  Sulemania Grain Silos and Warehouses Project  Nurol Construction Inc.  27,992,000 $  06/02/2013  In Progress
 Erection Works, ( 1100 Tons )                                                           The sum total of two regions have 20 silos
 B.O.F. Vacuum Gas Evacuation Plant   Ereğli Iron & Steel Works Co.   9,909,167 $  29/09/1992  06/02/1993  Steel Construction Manufacturing (1.640 Tons )  and 12 warehouses.                                
          SUB TOTAL                                             393.600.170 $
 Steel Construction Manufacturing (Materials
 2. Hot Mill Building South Extension   Ereğli Iron & Steel Works Co.  1,786,988 $  25/12/1992  18/04/1993
 Supplied By The Client) (358 tons)
 Steel Construction Manufacturing  (Materials
 2. Cold Rolling Mill Steel Construction Manufacturing    Ereğli Iron & Steel Works Co.   5,148,066 $  15/11/1993  10/08/1994  SPECIAL - TECHNOLOGICAL MANUFACTURING
 Supplied By The Client)
                          th
                       rd
          Çayırhan Thermal Plant, 3 and 4  Unit Steel Construction of Coal               Conveyor Bridges, Steel Construction
 Steel Construction Manufacturing (Materials   Transport Conveyors.  Güriş Construction Co. Inc.  61,137,449 $  10/05/1996  26/11/1997  Manufacturing (3506 Tons)
 Steel Mill Vacuum Degassing Plant Second Section  Ereğli Iron & Steel Works Co.  7,875,601 $  19/04/1994  09/12/1994
 Supplied by the Client) (745 tons )
                                                                                         Monument Turning System, Mechanical,
 Kangal Thermal Plant  GAMA Industry Inc.  1,471,130 $  25/09/1997  01/05/1998  Steel Construction Manufacturing (400 tons)   Ashgabat Neutrality Monument Turning and Control Systems   Polimeks A.Ş.  527,997 $  08/07/1998  30/11/1998  Hydraulic and Electrical Systems
 Ankara Combined Cycle Power Plant, Machine Hall Building Steel   Elin Elmak - Yüksel İnşaat A.Ş.  4,482,383 $  28/01/2002  14/06/2002  Machine Hole Steel Construction   Manufacturing and Erection
 Structure   Manufacturing and Erection                                                  6 Each Steel Temming Ladle Manufacturing,
          Steel Temming Ladle Manufacturing   Ereğli Iron & Steel Works Co.   2,295,905 $  22/12/1994  30/05/1995
 Cement Factory Dust Collection System. Steel                                            Ø 3577 x 3980 mm 120 Tons Capacity
 Cement Factory Dust Collection Plant  Gama A.Ş.  1,879,705 $  09/02/1996  11/12/1996
 Construction (247 Tons)   Feke Crushing and Shifting Plant Screens   Cam-İş Co. Inc.  209,777 $  05/11/1996  31/01/1997  2 Unit Vibratory Screens Manufacturing and Erection
 Çan Thermal Power Plant, Coal and Ash Conveyor   Techint - Teknotes Ltd. Şti.  8,064,229 $  27/08/2001  30/08/2002  Steel Construction Manufacturing Works   Bucket Elevator, 4 Each Screw Conveyor, 1 Each
          Supply System of Soda Ash Silos   Trakya Cam Industry Co. Inc.   1,960,768 $  23/03/1997  01/07/1997
 Çan Thermal Power Plant  Alstom Power Teknotes Ltd. Şti.  7,713,729 $  09/07/2001  09/07/2002  Steel Construction Manufacturing Works   Vibrator Screen, Design, Manufacturing, Erection
 Belgium CCPP  Aalborg Engineering  992,090 $  26/08/2004  28/02/2005  Steel Construction Manufacturing Works (420 Tons)  BISEN LM 6000  Babcock & Wilcox & Gama  3,674,861 $  02/06/1998  30/07/1998  HRSG Section, Module and Drum
                                                                                         Manufacturing (320 Tons)
 Steel Girder and Beams Main Force Vektor
 Kazakhistan Rafinery  Petrofac  2,006,170 $  30/10/2007  30/11/2008  TENGIZ Project, Water Treatment Tank Manufacturing, Stack
 Structural Steel  Fabrication (1430 Tons)  Babcock & Wilcox & Gama  2,300,853 $  08/06/1998  10/08/1998  Water Treatment Tanks, Stacks ( 130 Tons )
          Manufacturing
 Warehouse Roof  Steel Construction
 FMC-NUROL Armoured Vehicle Factory  FMC - Nurol Defence Industry  Inc.   2,861,360 $  22/05/1996  29/06/1996  Nuh Cement Project, Boiler Manufacturing   Babcock & Wilcox & Gama  3,658,600 $  11/06/1998  30/09/1998  Casing and Inlet Flue Duct Manufacturing ( 155 Tons )
 Manufacturing and Erection  (4200 m ,100 Tons)
 2
          İsdemir, Casting Facility Tundish Fabrication Woks  İskenderun Iron & Steel Co.  154,323 $  02/01/2004  30/05/2004  8 Each Tundish Fabrication Works (100 Tons)
 Building Steel Construction Manufacturing
 HYUNDAI Automobile Factory   Alsim-Alarko Co. Inc.   20,272,863 $  30/05/1996  31/12/1996
 2
 and Erection   (12.800 m  ,1400 tons)      Defense Technologies Engineering
          Wind Tunnel Fan Manufacturing                          187,979 $  24/01/2008  30/06/2008  4 Units of Wind Tunnel Fans Manufacturing
 Steel Substructure of Roof, Wall and Floor   ( STM )
 Modification of T.B.M.M. Meeting Hall    Nurol-Mesa  JV   12,187,511 $  02/01/1997  20/10/1997
 Cladding (95 Tons)                                                                      Vacuum Furnaces, Containers, Reactors and
          Process Equipment Manufacturing   Nurol Technology     1,010,729 $  28/02/2008  31/07/2008
 Atak Engineering Construction Ind.                                                      Various Machinery Manufacturing
 Moskow Klin Beer Factory  9,948,760 $  03/11/1997  30/04/1998  Steel Construction Manufacturing (820 Tons)
 And Trade Limited Company   SUB TOTAL                           77.119.242 $
          GRAND TOTAL                                           1.493.202.168 $