IRAQ    SILO































         Iraq-Sulaymaniyah






        The project which was started in Sulaymaniyah -     90 % of our project has been completed and it shall be
        Iraq on 06.02.2013 and which we are carrying out    delivered to the Ministry by in 2015.
        on behalf of the Ministry of Industry & Commerce
        of Kurdistan Regional Government is currently in
        progress in two different locations in Peramagroon
        and Hwana regions.


        Within the scope of Peramagroon Silo site with
 SPORTIVE IMAGE   ur Turkish Ambassador to Baghdad, IRAQ   approximately 11 hectares of surface area, works
        are ongoing for installation of a silo with 80.000
 Faruk KAYMAKÇI, our Commercial Attaché
 OTüğrul GÖRGÜN, other valuable guests, the   tons  total  dry load  capacity  ,  manufacturing
   OF BAGHDAD   members of the Embassy, have visited our site to-  & installation of 160 tons steel control tower,
        manufacturing  & installation of 4 steel
 gether with İş Bankası Baghdad Branch Manager
                             2
 and Ziraat Bankası Baghdad Branch Manager.   warehouses 1.200 m  each with a total weight of
        340 tons, manufacturing & installation of 600 m  2
        administrative building, security booth, Guest rest
        house, Laboratory building, Weigh House, 4 units of
 Our site employees immortalized the memories   6 m. high watch towers, construction of generator
 of building construction by sitting in two opposite   building and pump building, infrastructure works
 tribunes as two separate groups consisting of 150   and 26.000 m  concrete road,
                      2
 persons each
        Within the scope of Hwana Steel Warehouse site
        with 7 hectares surface area, works are ongoing
        for manufacturing  & installation of 8 steel
        warehouses 1.200 m  each with a total weight
                             2
        of 680 tons, construction of generator building,
        pump building, 600 m  administrative building,
                                2
        reception building, infrastructure works and
        15.000 m  concrete road