Page 17 - World Of Nurol Magazine-23
P. 17
Baghdad Sadr City
Stadium Complex
As a result of the tender won, we have signed the contract for Baghdad Sadr City Stadium Complex Project
in January 2012.
This project which will be built on 18 hectares of land and comprises a main stadium with the capacity of
30.000 spectators, two training fields for 2.000 and 500 spectators and 50 roomed 4-star guesthouse will be
executed on a turnkey basis, including the design.
Earth works and excavation/foundation works of the project carried out by our local and reached 10% by the
end of December 2012. Consultancy and engineering design services are being provided from Turkey.