Page 38 - World Of Nurol Magazine-20
P. 38

Nurol nationwide










              NUROL CONSTRUCTION





              ANKARA - POZANTI MOTORWAY


              AT THE COMPLETION STAGE









              Ankara - Pozantı Motorway consists the  final part of   TEM  Motorway in Central  Anatolia.
              Kemerhisar - Eminlik Section  which was entirely (main line + access roads) constructed as 2x3 type is
              completely located within Niğde  province borders . The length of this section is  55 km  (24 km  main line +
              31 km linking roads),  in this route there are engineering structures consist of  136 culverts, 10 underpasses,
              3 bridges and one overpass.
              Within the scope of the project,  besides there  has been constructed a viaduct with 14 pans. The average
              height of viaduct legs is  26.43 m with a maximum height of 42 m. Motorway,  which the construction was
              initiated in June 2000, has been brought to completion phase in terms of January 2011.



















































          36
          38
   33   34   35   36   37   38   39   40   41   42   43