Page 38 - World Of Nurol Magazine-20
P. 38
Nurol nationwide
NUROL CONSTRUCTION
ANKARA - POZANTI MOTORWAY
AT THE COMPLETION STAGE
Ankara - Pozantı Motorway consists the final part of TEM Motorway in Central Anatolia.
Kemerhisar - Eminlik Section which was entirely (main line + access roads) constructed as 2x3 type is
completely located within Niğde province borders . The length of this section is 55 km (24 km main line +
31 km linking roads), in this route there are engineering structures consist of 136 culverts, 10 underpasses,
3 bridges and one overpass.
Within the scope of the project, besides there has been constructed a viaduct with 14 pans. The average
height of viaduct legs is 26.43 m with a maximum height of 42 m. Motorway, which the construction was
initiated in June 2000, has been brought to completion phase in terms of January 2011.
36
38