Page 35 - World Of Nurol Magazine-19
P. 35

THE PROPOSAL OF THE CONSORTIUM OF NUROL






                  CONSTRUCTION INC.  IS ANNOUNCED TO BE THE



                  BEST PROPOSAL



                  The proposal letters of Gebze – İzmir motorway Construct- Operate- Transfer bidding have been
                  opened on the 19th of June 2009 and the 22 years and 4 months’ proposal of the NUROL – OZALTIN-
                  MAKYOL- ASTALDI- YUKSEL- GOCAY GROUP of which we are a member, has been announced
                  as the best proposal.



























                     Standing (from left to right): Ahmet Ali ÇELEBİ (MAKYOL), Lugi REALİNİ (ASTALDI), Hayrettin ÖZALTIN (ÖZALTIN), Erdal EREN
                     (GÖÇAY), Nurettin ÇARMIKLI (NUROL), Mustafa GÖÇE (GÖÇAY)
                     Front (from left to right): Adnan ÇELEBİ (MAKYOL), Emin SAZAK ( YÜKSEL), G. ROTH (ASTALDI), Ministerial Officer, Binali YILDIRIM
                     (Transportation Manager), Cahit TURHAN (KGM General Manager), Uğur TERZİOĞLU (ASTALDI), Ministerial Officer, Hüsnü DOĞAN (NUROL)


                  The  initials  for  the  contract  have  been
                  completed  as  the  first approval and the
                  YPK  approval  phases  have  been  started.
                  Within  the  scope  of  this  contract,  which
                  will be certain after the related bureaucratic
                  procedures  and  approvals  the  key-ready
                  delivery construction and the transfer to the
                  administration  at  the  end  of  the  operation
                  period of the 420 kilometer long motorway
                  will be realized. Within the scope of project
                  whose  proposals  have  been  collected  in
                  previous April,  the  3  kilometer  long  Izmit
                  Bay  Passing  Bridge  which  is  going  to  be
                  the second longest suspension bridge in the
                  world with its 1.7 kilometers of sea opening
                  distance will be materialized


                                                                                                                         33
   30   31   32   33   34   35   36   37   38   39   40