The abutments of Izmit Bay Crossing Suspension Bridge were completed within two months thanks to Turkish scientists – discovered system instead of eight months. A system making the stone cladding deep sea floor was developed with the project where Nurol Construction was consortium leader. This system was actualized by the support of TUBITAK TEYDEB for the first time in the Republic of Turkey.