3 units of impellers have been landed to Ilısu Dam of General Directorate of State Hydraulic Works (DSİ), which is under construction. In the construction of Ilısu Dam and HES with an aggregate 1200 MW installed capacity, consisting of 6 units, each having 200 MW capacity, 16th Regional Directorate of Hydraulic Works has taken yet another important turn in the electromechanical assembly work of Unit 3. 460-ton impeller with 8150 mm diameter has been landed through the help of two power house main cranes, each having 250-ton capacity.